Berkshire Bank Supports Projects with Central Berkshire Habitat for Humanity

Print Story | Email Story
PITTSFIELD, Mass. — Central Berkshire Habitat for Humanity (CBHFH) and Berkshire Bank announced plans for the 2022 Westside Xtraordinary Day this June 8, a day dedicated to community revitalization and volunteerism in the Westside neighborhood of Pittsfield.
 
"We are looking forward to once again holding our Xtraordinary Day in the communities we serve as it is a source of pride for our employees who are eager to make positive contributions," said Lori Gazzillo Kiely, Director of the Berkshire Bank Foundation. "We're proud to dedicate an entire afternoon to lifting up our communities through projects such as this neighborhood revitalization in partnership with Central Berkshire Habitat for Humanity."
 
Berkshire Bank's Xtraordinary Day (X-Day) is held across five states – MA, NY, VT, CT, and RI, with branches and offices closing from 12pm - 4pm on June 8 for concurrent day of community service events.
 
In Pittsfield, the day brings together approximately 200 volunteers from Berkshire Bank to work alongside Westside neighbors, and Habitat for Humanity staff and volunteers as part of a day of service. Homeowners and renters within a concentrated work area benefit from a variety of home repair and landscaping options such as fence repair, small painting projects, power-washing, and application of house numbers. Some residents have opted to receive elevated garden planters with floral and vegetable plantings. Ultimately, the whole neighborhood benefits from this event with an increased sense of community and pride of ownership.
 
And this year, Habitat is distributing a number of donated Ring video doorbells including lifetime subscriptions to those residents who participate in the day's activities. Leading up to this event, for those residents that already had working doorbells installed, Habitat has been working with Taconic High School's CTE program Electricity Program to have junior year students do the installations throughout the neighborhood.
 
To add to the neighborhood esthetic, local artist and art teacher, Hope Aguilera and her students from Pittsfield High School will be designing and painting a community mural on the side of B&P Auto Supply's shop on Columbus Ave, directly next to a new Habitat construction build site on Robbins Ave. 
 
"We are excited to be working with a group of young artists who will help us transform an ordinary brick wall into a positive vision of the neighborhood," Gazzillo said.
 
"Habitat is proud to bring people together to build homes, communities, and hope. We are thankful for the generous sponsorship and volunteer efforts of Berkshire Bank, neighborhood residents, and grassroots organizations that are working together on the revitalization efforts in the Westside," said CBHFH CEO Carolyn Valli.

Tags: habitat for humanity,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Pittsfield Council OKs $3M Borrowing for Failing PHS Boilers

By Brittany PolitoiBerkshires Staff

PITTSFIELD, Mass. — The City Council has authorized the borrowing of $3 million for new boilers at Pittsfield High School — a project that was originally going to be funded by ARPA.

The nearly 100-year-old boilers are original to the building and have exceeded their useful life, officials say. They are converted locomotive engines that are extremely inefficient and expensive to maintain.

The replacement design was recently completed and a low bid was received. After looking at the numbers, it was clear that the allocated $1 million in American Rescue Plan Act funds would not be enough.

"$213,210 was spent on emergency repairs and the design work for the replacement project," Finance Director Matthew Kerwood confirmed in an email.
 
"The low and only bid for the replacement was $2,482,000, however given the complexity of this project I felt that a 20 percent contingency would be needed which gets to the $3,000,000 authorization. If the entire amount is not needed, the remaining unused balance will be rescinded at some point in the future."

The project is also time-sensitive, as one boiler is non-operational and another is severely compromised. If they fail during the heating season, the school will have to close.

"The contractor that was the low bid, in 30 days he can walk away from that bid if he wants to, and the other problem is I need to get this project underway to hopefully get them in and running by the time school reopens up for wintertime," Building Maintenance Director Brian Filiault explained.

"This is a major project, a major project. We're taking three locomotives out of that building and it's no easy thing. I mean, the building is built around it and we have a small portal that we actually will be able to get it out, we'll have to crane everything else. It's a very labor-intensive, very hard job, and I'm afraid of the timeframe because I can't run those boilers again. They've gone as far as they're going to go."

View Full Story

More Pittsfield Stories